The directors and all contractors at Solid Renewables have a wealth of experience of working on renewable energy projects as well as general building services.
Solid Renewables have successfully overseen, managed and commissioned numerous construction projects - including new builds, renovations and refurbishments - to meet a wide variety of customer specifications, in many different environments. Solid Renewables particular areas of interest and expertise is in renewable energy and electrical installations.
All designs are overseen by an experienced Mechanical Engineer with over 10 years industry experience, gained in both the domestic and commercial sectors.
Solid Renewables ONLY hires contractors with a proven track record of delivering successful projects on time and on budget to the highest of standards, with all the required industry-recognised qualifications and accreditations.
For Cottonmill Community Centre: installation of Solar PV, Heat Pump, Air Conditioning and ventilation / MVHR.
4.13kW Solar PV installation with a Solaredge inverter, and 11KW heat pump with underfloor heating application.
Boat House Case Study – 11kW Ecodan Air Source Heat Pump with Solar Thermal, Ecodan first ever project to provided 100% heat and Hot water demand for a Boat House
2 x Worcester Air Condition, 11kW Ecodan Air Source Heat Pump, 2 X Tesla Powerwall Back up Batteries all powered by 5.28kW Solar PV. This system still powers the House even when the Grid is down.
16kW Samsung Heat Pump with 9.24kW LG Solar PV and SMA inverter to offset heating Running Cost.
2 x 8kW NIBE Air Source Heat Pump with 6.72kW Solar PV with Solar to offset heating Running Cost
2.28kW Solar PV installation with a Solaredge inverter, with immersion device for domestic hot water (DWH).
6.9kW Solar PV installation with Solaredge inverter, along with a 3kW immersion device for domestic hot water (DWH).
We installed an on-roof 1.08kW solar PV system for a property developer, to meet the SAP Report renewable energy demand for a communal area in an apartment block.
This 0.57kW solar pv installation for two semi-detached residential properties was to meet the SAP Report requirement, on behalf of a property developer.
1.5kW Enphase Solar PV installation with immersion device for domestic hot water (DWH) and a 8.5kW heat pump with underfloor heating application.